₱3,400,000.00 (Fixed)

Set A. @ 20 kg per block 500 pcs per day Set B @ 10 kg per block 100 pcs per day 3 Phase Electricity required R.O Filtra...

  • Gold St, Bajada, Davao City, Davao del Sur, Philippines
  • ConditionNew
  • WarrantyYes
October 13, 2020

₱2,400,000.00 (Fixed)

Set A. @ 10 kg per Block 500 pcs per day Set B @ 5 kg per Block 1000 pcs per day 3 Phase Electricity required R.O Filtra...

  • Gold St, Bajada, Davao City, Davao del Sur, Philippines
  • ConditionNew
  • WarrantyYes
October 13, 2020

₱4,480,000.00 (Fixed)

15,000 kg daily capacity produce continuously Price includes: Storage and Steel Frame Beam 3 Phase Electricity required ...

  • Gold St, Bajada, Davao City, Davao del Sur, Philippines
  • ConditionNew
  • WarrantyYes
October 13, 2020

₱3,750,000.00 (Fixed)

10,000kg daily production 417 kg hourly production 139kg every 20 minutes R.O Filtration system required 3 Phase electri...

  • Gold St, Bajada, Davao City, Davao del Sur, Philippines
  • ConditionNew
  • WarrantyYes
October 13, 2020

₱2,500,000.00 (Fixed)

5,000 kg Daily Production 209 kg hourly production 70 kg every 20 minutes  R.O Filtration system required 3 Phase Electr...

  • Gold St, Bajada, Davao City, Davao del Sur, Philippines
  • ConditionNew
  • WarrantyYes
October 13, 2020

₱1,850,000.00 (Fixed)

3000kg daily production 125 hourly production 42kg every 20 minutes R.O Filtration system required 3 Phase Electricity r...

  • Gold St, Bajada, Davao City, Davao del Sur, Philippines
  • ConditionNew
  • WarrantyYes
October 13, 2020

₱1,550,000.00 (Fixed)

2,000 kg daily production 84kg hourly production 28 kg every 20 minutes R.O Filtration system required 3 Phase electrici...

  • Gold St, Bajada, Davao City, Davao del Sur, Philippines
  • ConditionNew
  • WarrantyYes
October 13, 2020
Top